公司业绩-- 近期部分工程项目
施工时间:2021年4月——至今
施工地点:烟台中集来福士海洋有限公司
施工项目:
整包30万吨级MERO3 FPSO改装特涂工程、普涂工程。
马油Mero3管线、舾装件内外喷涂,巴油P80,P83,84,85管线FBE、管线舾装件内外喷涂施工。(施工地点在山东大亚海洋淄博项目基地)
荷兰Van Oord JUV BOREAS风电安装船,博强3060风电安装船,挪威Havfram
风电安装船的酸洗磷化施工。(施工地点在山东大亚海洋淄博项目基地)
马油Mero3,巴油P80,P83的钝化施工。(施工地点在山东大亚海洋淄博项目基地)
Construction time: From April 2021 to now
Construction site: Yantai CIMC Raffles Marine Co., LTD
Construction project:
A, the whole package of 300,000-ton MERO3 FPSO retrofit special coating project, general coating project.
B, Malasia oil Mero3 pipeline, outfitting parts inside and outside spraying, Ba oil P80, P83,84,85 pipeline FBE, pipeline outfitting parts inside and outside
Spraying construction. (Construction site in Shandong Daya Ocean Zibo project base)
C. Dutch Van Oord JUV BOREAS wind power installation vessel, Boqiang 3060 wind power installation vessel, Norwegian Hav fram
Pickling phosphating construction of wind power installation ship. (Construction site in Shandong Daya Ocean Zibo project base)
D. Passivation construction of horse oil Mero3, bar oil P80, P83. (Construction site in Shandong Daya Ocean Zibo project base)
2、施工时间:2022年4月——至今
施工地点:海阳中集来福士海洋工程有限公司
施工项目:
A、P78 FPSO分段、散件涂装。
B、管线、舾装件喷涂施工。(施工地点在山东大亚海洋淄博项目基地)
C、巴油P78钝化施工。(施工地点在山东大亚海洋淄博项目基地)
Construction time: from April 2022 to now
Construction site: Haiyang CIMC Raffles Marine Engineering Co., LTD
Construction project:
A, P78 FPSO segment, sections, parts coating.
B, pipeline, outfitting parts spraying construction. (Construction site in Shandong Daya Ocean Zibo project base)
C, Bar-oil P78 passivation construction. (Construction site in Shandong Daya Ocean Zibo project base)
3、施工时间:2023年10月---至今
施工地点:青岛武船麦克德莫特海洋工程有限公司
施工项目:
Q0236 Yellowtall 项目管线、舾装件喷涂施工。(施工地点在山东大亚海洋
淄博项目基地)
Construction time: October 2023 -- now
Construction site: Qingdao Wucuan McDermott Marine Engineering Co., LTD
Construction project:
A, Q0236 Yellowtall project pipeline and outfitting spray construction. The construction site is in Daya Ocean, Shandong Province Zibo Project Base)